Test Pondasi PDA - PDA testing foundation / pile

PILE DYNAMIC LOAD TEST (PDA)

Test PDA ini di Indonesia ada beberapa perusahaan yang bisa menangani yaitu :

1. PT. Multi Ageotescon

  • Address:
    Perkantan Villa Delima Unit 9
    Jl Karang Tengah Raya 9
    Cilandak, Jakarta Selatan
    INDONESIA 12440
  • Kategori:
    Construction Equipment
  • Telepon:+62 21 7698069
  • Fax:+62 21 7691866
  • Email:

2. PT. Borland

Borland Nusantara Corporation Pt

Jl Raya P Diponegoro 61, Surabaya

t: 031-568-4426






Foundtest (M) Sdn. Bhd. is specialized in providing high strain dynamic load testing, analysis and consulting services for the piling work industry. Dynamic pile testing (commonly known as PDA test) is performed by well-trained and experience engineers using a Pile Driving Analyzer (PDA) on site and pile wave analysis will be carried out on the signal acquired by using Pile Wave Analysis Program by Characteristic (WAPC).

Dynamic pile testing technology had been introduced to the industry for more than 30 years. This time and cost saving method of pile testing has eventually getting popular and is widely recognized nowadays. The American Society of Testing and Materials has developed a standard (ASTM:D4945) for the performance of dynamic load test. It is a very cost-efficient tool used to replace the time consuming conventional static load test in determination of pile capacity.

PDA is a very powerful tool in monitoring the response of a pile subjected to hammer impact applied at the pile head. The response is measured in terms of force and acceleration close to the pile head. Other than determination of pile capacity, the behaviour during the pile installation works, such as the pile integrity, driving stresses and the energy transmitted to the pile. Once the pile wave analysis is completed, the full report will present the predicted static load-settlement behaviour and the pile capacity distribution among the pile shaft and pile toe. All these information are very useful in assessment of the pile capabilities by the engineers.